The following is a list of general highway maintenance and construction work the Missouri Department of Transportation has planned in Atchison County for the week of September 26 – October 2.
All road closures and planned roadwork may be viewed on the Traveler Information Map at http://traveler.modot.org/map/.
Interstate-29 – Bridge replacement project over the Nishnabotna River (mile marker 122 – 124) through November. Traffic is head-to-head in the northbound lanes. (Contractor: Phillips Hardy, Inc.) More info: https://www.modot.org/atchison-county-interstate-29-nishnabotna-river-bridge-rehabilitation
I-29 – Patching and resurfacing project from Route 111 near Exit 107 to Exit 99 near Corning, through October. The road may be narrowed to one lane each direction in 2-mile increments. (Contractor: Emery Sapp & Sons, Inc.)
U.S. Route 136 – Resurfacing project from the Missouri River to I-29 through November 2023. (Contractor: Phillips Hardy, Inc.)
U.S. Route 136 – Pothole patching from Rock Port to Tarkio, September 26 – 30












