
Tarkio Tech has completed its resurfacing project. The upper and lower parking lots are now paved and visitors will enjoy the smooth ride down to the back side of Thompson. IG Construction, Lexington, Missouri, has patched and sealed the entry road, the top lot is now paved instead of gravel, and the road to and including the back lot has been resurfaced. They also painted the curbs and added parking lines with handicap designations.(Submitted photos)












