The following is a list of general highway maintenance and construction work the Missouri Department of Transportation has planned in Atchison County for the week of October 28-November 3.

There also may be moving operations throughout the region. Inclement weather may cause schedule changes in some of the planned work. Check the MoDOT Traveler Information Map at http://traveler.modot.org, or download the app for updated information.

MoDOT asks drivers to buckle up, put your phone down, slow down and move over in work zones.

U.S. Route 59 – Resurfacing project from Route 46 near Fairfax to Interstate 29 through November 2024.

Interstate 29 – Concrete replacement southbound driving lane from 114 mile marker to 112 mile marker, Oct. 28-Nov. 1.

U.S. Route 136 – Bridge inspection at the Missouri River Bridge, Oct. 28-31. The bridge will be narrowed to one lane during the inspection.